Wednesday, April 29, 2009

Knitting in the car

Today was our first day of our trip to Yuma, AZ. So after being in the car for a little over an hour, I pulled out my knitting and started knitting on some Tonks Toddler Socks Size 4. I managed to get 30 rows knitted before we stopped to rest, stretch and let our shih tzu's out for a walk. When we finally got back on the road and had been driving for a while, I picked up my knitting again. When we finally stopped for lunch I had the cuff, leg, heel flap and heel turn finished. After lunch, and a nice walk with my dogs to stretch our legs and all that other good stuff we got back on the road. Once on the road, I picked up my knitting again and managed to finish up the first sock and start on the mate before putting my knitting away for the day. I ended up knitting 120 rows total between 1 completed sock and starting on the mate to it. Tomorrow I should have this pair of socks completed, and then I'll start on some new socks.

Wednesday, April 15, 2009

Tonks Toddler Socks Size 4

Okay all my packing is done for now. So I'm back to knitting away the days until my hubby comes home. So on April 11th, I started knitting up some more Toddler Socks Size 4 to add to some that I already have for my website.

When I'm not running errands I can knit up 1 pair in a day. However, when your getting ready to move all kinds of errands come up that you need to run during the day. So at night I sit on the couch and knit for about 3 1/2 hours before going to bed.

Sometimes I'm up bright and early (like 5:30 am) and I'll sit on the couch and knit for 1 1/2 hours before fixing my breakfast and figuring out what errands will need to be run that day. Sometimes I'm lucky and I only have 1 or 2 errands that need to be done so I can knit more on that day.

Tuesday, April 14, 2009

Harry and Ron Childrens Socks Size11


Harry and Ron Childrens Socks Size11
Originally uploaded by Spinningginny46I started knitting on these socks on April 4th in between packing up boxes for our move to Yuma Arizonia. I really finished knitting up the first pair on the 8th of April and then started on another pair. I actually was able to knit 2 pairs plus 1 extra lone sock from this 100 gram ball of Opal Harry Potter Sock Yarn (Harry & Ron).

When I first started knitting on these socks I started with a design that I thought would work with 44 sts. However, I didn't care for the pattern so ripped it out and started over. Then when I was talking to my mom on the phone (she lives in CA). We discussed diamond shapes and I came up with a fairly nice diamond pattern for this pair of socks.

This pattern was fairly simple with just some knits and purls placed evenly (or fairly evenly), through out the rows. One diamond is a little larger then the ones opposite it. However, it really gave the socks a nice look. You can't really see the pattern in the picture due to the different colors in the yarn. So down the road I might look through my stash (once I'm settled), in Yuma AZ and see if I can find some solid color sock yarn and knit up some more.

I had kept out some sock yarn as well as some Cotton dish cloth yarn to knit with in the evenings. This gives me something to do at night while watching tv. Now that most of the household items are packed up I'll go back to knitting more to pass the time until we leave. Which will be sometime after the 24th of April, in the meantime I'll keep on knitting away the days.